Henderson Driveways

Block Paving

14

driveways

A new driveway will enhance and add value to your home from the moment it is installed. Every step of the way we ensure that your driveway design is completed to your complete satisfaction. We can help you choose the design and colours to best complement your home by providing drawings and samples of materials etc…

Block Paving

Block paving, when laid properly is incredibly durable. Providing the sub base is substantial the driveway will not to crack, sink, dip or have anything grow through it. Hence the quality of the sub base is of paramount importance in providing permanence. Block paving laid by Henderson Driveways comes with a guarantee, which we are able to provide due to the quality of the foundations we lay.

Complete Job 1

Complete Job 2

Gravel

Gravel Driveways, when laid properly is incredibly cost-effective and durable. Providing the correct sub base is essential to ensure the driveway to stop weed or anything grow through it. Hence the quality of the sub base is of paramount importance in providing permanence. Gravel driveways laid by Henderson comes with a guarantee, which we are able to provide due to the quality of the foundations we lay.

Restoration

Our cleaning and repair service can restore your block paving to its former glory. Pressure cleaning removes moss, algae and slime, whilst our re-sanding and sealing processes can enhance the colour of stone, stops oil stains, weathering and weed growth.
photo42

Our Process

Initial Survey & Inspection
  • Site visit
  • Survey of the site
  • Subsoil and ground condition inspection
  • Survey of drainage and other services
  • Tree and planting survey to identify potential future 
    damage to the driveway
Laying Inspection
  • Check sub base
  • Check compaction
  • Laying of blocks to specification
  • Drainage and manhole covers to specification
  • Check steps, risers and treads
  • Health & safety check
Post-excavation inspection
  • Check standard of excavation
  • Check ground conditions
  • Check all debris cleared and removed
  • Check soakaway
  • Check heights, levels and setting out
  • Check correct installation of edge restraints
Final Inspection
  • Inspect completed job
  • Check snagging as appropriate
  • Check joint filling sand applied
  • Check final compaction
  • Check making good
  • Ensure all waste removed and site left clean and tid